The second batch(45days for conceptual plan)
Serial number | Batch | Project Name(Task) | Project Location | Status Description | Constuction Scale |
---|---|---|---|---|---|
1 | The second batch | Reconstruction of the Pocket Park in the Longjin Second Street | South Side of the Substation,North Road,Harmonious Home District, Longjin Second Street | It is illegal land and used for building materials storage currently,The project plans to build a pocket park.It is known that the ownership of the land belongs to the Shounong Group after the on-site reconnaissance. There exists problems of the rights to use the project construction land. The land is occupied by the materials of the disputed party and the nature of the land to be used is verified. | 3000 |
2 | Reconstruction of the Basement in the West Second District | The Activity Center in the Second District of Tiantong Xiyuan | Vacant Space waiting to be used,The second community of Tiantong Xiyuan is a super-large community. The residents' cultural sites are extremely scarce, and the residents' needs are large and strongly reflected. The West Second Community is a joint construction unit of the Beijing Municipal Construction and Construction Committee. The underground space utilization has been included in the project by the Municipal Housing and Construction Committee as one of the practical problems at the grassroots level.The Municipal Housing and Construction Committee has communicated with the developers of the property rights unit about the use of this underground space. The developers basically agreed and plan to communicate and dock with the community before or after May 1st. | 800 | |
3 | Reconstruction of the Basement in the Third Community of Tiantong Xiyuan | Basement of the Building No.3, the West Third District,Tiantongyuan | At present, it is a residential activity room. The underground space is low-lying, and there is rainwater inversion in the summer. The decoration conditions are poor. Meanwhile, the meeting rooms and dance studios are not available to meet the needs of residents. | 1000 | |
4 | The Community Pocket Park in the First Community of Tiantong Dongyuan | The First Community of Tiantong Dongyuan | Improve the living conditions by greening and beautifying the environment.Promote landscape improvement along the mian line of traffic. Provide leisure place for the public to take a walk. | 2200 | |
5 | Reconstruction of the Basement in the Dongya Shangbei | Basement of the Building No.12, Dongya Shangbei | The group rented house is vacant after cleaning, the area is about 800 square meters .It is planned to build a community activity space in the basement of Building No. 12. The basement is a non-personal defense basement with two stairwells and one elevator. The ownership is shared by the community. After the completion, it will be managed by the residential property. The property of the community has a cooperative relationship with Hongqi Publishing House, and the basement is built as a party building leading area and a community activity room. The water, electricity and fire protection facilities in the site are fully functional, and the basement has a separate power distribution room to meet the basic conditions for project construction and operation. | 500 |
"Live in Huitian" City Affairs Society Contest Mission Package Information(PHOTOES\CAD\GPS)
Download