The third batch

The third batch(60days for conceptual plan)

Serial number Batch Project Name(Task) Project Location Status Description Constuction Scale
1 The third batch Outerdoor Sports Ground in the Xiaoxinzhuang Village Community Xiaoxinzhuang Village South Plants planted after the industrial courtyard is retired,After on-site reconnaissance, about 20 mu of land on the west side of Xiaoxinzhuang Bus Station was idle. This time, it is planned to build a sports leisure plaza, which includes a football field and a tennis court. The nature of the site is to be verified. 70000
2 Reconstruction of the Abandoned Boiler House in the Longcheng Garden Longcheng Garden It was originally used for coal storing and was idle after the coal was changed to gas in 2014. The coal storage area is about 1,300 square meters, the wall is 6 meters high, and there are 800 square meters of yards around. The coal storage has been idle for a long time. Weeds are overgrown and the environment is messy. 2100

Outerdoor Sports Ground in the Xiaoxinzhuang Village Community

Reconstruction of the Abandoned Boiler House in the Longcheng Garden

Data download

"Live in Huitian" City Affairs Society Contest Mission Package Information(PHOTOES\CAD\GPS)

Download